Pegoraro Gas Technologies designed and realized a gas pressure filtering, reducing and metering station powered by LNG treatment plant: this solution is one of the first installation in Italy.
LNG treatment plant is composed by a cryogenic tank with capacity of 100 cubic meters at -160°C and an atmospheric heat exchangers system.
The plant is supplied and filled weekly by a trailer loaded with LNG coming directly from Spain.
The fluid is stored into the cryogenic tank: through the atmospheric heat exchangers system, the gas passes naturally from LNG liquid state to gaseous state, ready to be injected into the gas network.
The pressure of the gas at the gaseous state coming from LNG treatment plant is reduced by our station.
The end-user monitors all the parameters (flow, pressure, measure, heating) by PLC.
- flow rate: 600 Nmch
- DN inlet=2”
- filters T.1,5 2”
- pressure regulating valve 1”1/2
- turbine meter 4”
- DN outlet=4”
- inlet pressure 5 bar
- outlet pressure 0,3 bar